Field measurement & site verification.

Every job starts with eyes on the floor — not a set of drawings on a screen.

Field measurement
Cityproof Systems

Capability

On-site verification

Overview

Our project leads survey existing conditions against architectural drawings, finish schedules, and ceiling grids before any glass or aluminum is released for fabrication. We flag deflection, slab pitch, demising-wall offsets, and ceiling interface conflicts in writing so the GC and design team can resolve them up front — not after the truck arrives.

"We do not release glass to the cutting floor until the field set is signed."

What's included

Scope of work

  • Laser-based dimensional capture against arch drawings
  • Slab-to-slab, slab-to-ceiling, and column conditions
  • Existing demising wall, drywall pocket, and ceiling grid alignment
  • Door swing, hardware reach, and ADA clearance verification

What you receive

Deliverables

  • Annotated red-line set returned to the design team
  • RFI log of unresolved conditions with photographs
  • Sign-off sheet before fabrication release