Punch-list & adjustment.
The last 2% — the part that decides whether a project feels finished.

Cityproof Systems
Capability
Punch-list walk
Overview
We walk the floor with the GC and the design team, log every item, and close it out. Hardware is re-adjusted after the building cycles, gaskets are dressed, and glass is final-cleaned. Items that require a re-order — a wrong-handed lock, a scratched lite — are tracked to delivery and re-install in writing.
"A signed-off punch list is the start of a service relationship — not the end of a project."
What's included
Scope of work
- Joint walk with GC and architect
- Hardware adjustment after first occupancy cycle
- Gasket dressing, sealant tooling, and final cleaning
- Re-order tracking for damaged or wrong-spec items
What you receive
Deliverables
- Punch list with status against each item
- Final close-out package and warranty letter
- Service contact handed to the facilities team